CLIENT; MO GRAPHITE TANZANIA LIMITED

PROJECT NAME; MERERANI GRAPHITE PROJECT (Simanjiro District, Arusha Region)

MINERAL PROVINCE; MOZAMBIQUE BELT (MERERANI GRAPHITE)

TIMEFRAME; Aprill, 2024 – Up to date

CURRENT PROJECT STATUS; MINE DEVELOPMENT

PROJECT IMPLEMENTS;

At the Mererani Graphite Project, the initial phase involved detailed mapping and outcrop sampling, where exposed rock areas were thoroughly examined to understand the geological context and graphite occurrence. This was followed by scout drilling to obtain preliminary insights into the continuity and thickness of mineralized zones. The results guided resource drilling, which aimed to generate more reliable data for resource evaluation.


Data from drilling were compiled and analyzed for resource estimation, determining the quantity and quality of graphite with technical accuracy. These results enabled the preparation of an economically and technically viable project plan. The final phase was mine development, involving construction of the mine, infrastructure, and operational setups to ensure efficient commercial production.